Sunkar Energy · Kazakhstan
Electricity will be the bottleneck.
Elon Musk's warning about the limits of AI growth, paraphrased
Kazakhstan has cheap gas and almost no AI computing capacity. We turn that gas into electricity next to the data center, in blocks of 5 MW, in months instead of years.
Scroll to follow the gas
The resource
Gas that is burned for nothing
Oil fields across the west of the country flare 300–340 million m³ of associated gas every year, at 40–60 fields. That is more than 1 TWh of electricity lost every year.
Focus
Zoom in on one field
Take a mid-size field in Mangystau, on the Caspian coast: wells, a separator, and a flare stack burning the gas that comes up with the oil.
Illustrative site layout, not a specific project.
Today
The gas goes to the flare
Pumpjacks lift crude oil mixed with associated petroleum gas. The separator splits them. With no pipeline or buyer nearby, the gas is burned.
Capture
Capture it and clean it
Instead of the flare, the gas goes through a short pipeline to a treatment skid that removes hydrogen sulfide. Fuel cells need clean, desulfurized gas.
Modular fuel cells
Electricity without combustion
Solid oxide fuel cells turn gas into electricity chemically, with no flame. Each 325 kW module ships ready to install. Sixteen of them make one 5 MW block.
- 53–65% electrical efficiency
- Power about 90 days from order, plus shipping
- No water in normal operation
- Exhaust heat above 350 °C can feed district heating
Still emits CO₂ (308–378 kg/MWh on natural gas).
Generation
Power in 5 MW blocks
Each block is a repeatable stamp: 16 modules, one pad, one feeder to the substation. Add blocks as tenants sign. No grid connection to wait for.
Change the site size with the control at the bottom right.
Data center
One data hall per block
Each 5 MW block feeds one liquid-cooled hall of about 36 AI racks at 120–140 kW. Kazakhstan's cold climate gives free cooling for much of the year.
Compute
Sovereign AI inference
Inside, GPUs run AI models for Kazakh users, companies and the state. Answers travel by fiber to Almaty, where 58% of the country's software is made.
The chain · 20 MW
What we sell is speed
Large gas turbines ordered today arrive around 2031. Power blocks running on gas that is already being burned deliver in 3 to 12 months.
- Gas per year
- 27 M m³
- Share of national flaring
- 8%
- Power plant cost
- $60–90M
- Data center, no chips
- $120–200M
- Colocation revenue / yr
- $22–36M
- CO₂ / yr
- 49–60 kt
Planning estimates as of November 2026, not supplier quotes. Assumes 90% availability and 58% fuel cell efficiency. Not legal, tax or financial advice.
Contact
Talk to us
Gas owners, data center tenants and investors: tell us about your site or your need. We answer within two working days.