Sunkar Energy
[email protected]

Sunkar Energy · Kazakhstan

Electricity will be the bottleneck.

Elon Musk's warning about the limits of AI growth, paraphrased

Kazakhstan has cheap gas and almost no AI computing capacity. We turn that gas into electricity next to the data center, in blocks of 5 MW, in months instead of years.

Scroll to follow the gas

The resource

Gas that is burned for nothing

Oil fields across the west of the country flare 300–340 million m³ of associated gas every year, at 40–60 fields. That is more than 1 TWh of electricity lost every year.

$1.7–3.4per MMBtu, industrial gas
~30.7 MWof data centers running today

Focus

Zoom in on one field

Take a mid-size field in Mangystau, on the Caspian coast: wells, a separator, and a flare stack burning the gas that comes up with the oil.

Illustrative site layout, not a specific project.

Today

The gas goes to the flare

Pumpjacks lift crude oil mixed with associated petroleum gas. The separator splits them. With no pipeline or buyer nearby, the gas is burned.

Capture

Capture it and clean it

Instead of the flare, the gas goes through a short pipeline to a treatment skid that removes hydrogen sulfide. Fuel cells need clean, desulfurized gas.

1,000 m³≈ 35 MMBtu of energy
$12–30fuel cost per MWh

Modular fuel cells

Electricity without combustion

Solid oxide fuel cells turn gas into electricity chemically, with no flame. Each 325 kW module ships ready to install. Sixteen of them make one 5 MW block.

  • 53–65% electrical efficiency
  • Power about 90 days from order, plus shipping
  • No water in normal operation
  • Exhaust heat above 350 °C can feed district heating

Still emits CO₂ (308–378 kg/MWh on natural gas).

Generation

Power in 5 MW blocks

Each block is a repeatable stamp: 16 modules, one pad, one feeder to the substation. Add blocks as tenants sign. No grid connection to wait for.

4 × 5 MWblocks on this site
64fuel cell modules

Change the site size with the control at the bottom right.

Data center

One data hall per block

Each 5 MW block feeds one liquid-cooled hall of about 36 AI racks at 120–140 kW. Kazakhstan's cold climate gives free cooling for much of the year.

4data halls
144AI racks

Compute

Sovereign AI inference

Inside, GPUs run AI models for Kazakh users, companies and the state. Answers travel by fiber to Almaty, where 58% of the country's software is made.

~15,000GPUs, at ~750 per MW
$240–480MGPU revenue per year

The chain · 20 MW

What we sell is speed

Large gas turbines ordered today arrive around 2031. Power blocks running on gas that is already being burned deliver in 3 to 12 months.

Gas per year
27 M m³
Share of national flaring
8%
Power plant cost
$60–90M
Data center, no chips
$120–200M
Colocation revenue / yr
$22–36M
CO₂ / yr
49–60 kt

Planning estimates as of November 2026, not supplier quotes. Assumes 90% availability and 58% fuel cell efficiency. Not legal, tax or financial advice.